FINALLY!
So, After getting the "Right side" of the room built, I was left with the 2 "connecting tracks" as the "track to nowhere" since the "Left side" needed to be built to have a destination.
This 2nd build went much easier than the 1st. Unfortunately, my current contract job has had a problem getting me back onboard since the computer said my contract had ended (end of May), even though it should be October. so current finances are locked up. The Left board is only 2/3 the length it will end at, and the 2nd upper level is on hold too. The rest of the switching yard has to wait on more plywood & sound board.
I ran the "last" wires for Switches & RCS (plus a couple of extras, is there ever a real "last time"? <chuckle> So here is a Real Run of a couple of cars.