Skip to main content

Reply to "My dream/nightmare layout... July Update 7/31/19 Big Boy month!"

Hi George, 

Well, I took all the feed back and am going to redesign a good potion of it. Folks suggested some modifications that are easy to do just time consuming + I had strike duty until mid June.

First, I am in the process of moving a wall and inserting a column. The is the key to get some added space to access the outside door.

Second, trying to take over one of the closets - clothes out - trains in - negotiations with my wife continue. 

Third, removed all the carpet and tiled the entire basement floor.

Fourth - added hot water base board heat to the room.

Fifth - Starting the re design - using a 34 inch TT now rather than the 28inch - this allows me to utilize the TT for my larger engines  - have a new Millhouse River TT on order. Also, the grade exchange was too steep so I need to figure out the best way to utilize the space to so what I want. With that said, I might create a 2 level rail with yards on each level to handle the interchange - Need to figure that out. What I did do / want to do is utilize some of the feedback from both you and Double Daz. 

Overall - had to re create / modify the space where possible, the base L is still the space I have.

Thanks for asking.

 

 

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×