Skip to main content

Reply to "Layout Build for the C&K CENTRAL RAILROAD *** Update *** 2-11-2018"

More progress on the swing gate / double deck bridge this weekend.  I got the gate hinges on, ply wood cut out might have to cut more out not sure yet, UHMW Poly glide strips installed & aligned and the wireless remote linear actuator & locking alignment pin installed.  Click here for a video of the gate in action eh.

Attachments

Images (11)
  • 20180128_170352
  • 20180128_170326
  • 20180128_170312
  • 20180128_170305
  • 20180128_170257
  • 20180128_170226
  • 20180128_170217
  • 20180128_170149
  • 20180128_170137
  • 20180128_170123
  • 20180128_170110
Last edited by chester7

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×