Its been a hectic 30 days since my last update. I have been able to work on my mountain scene, upper level layout some. The main body of the mountain face is 5' in so I have to climb on top of the layout and work for about an hour kneeling as I assemble the face of the mountain. I don't bend as easily as I use to...lol.
Upper level track. 36" loop.
rock facing bout done
I need to add trees to this area.