Skip to main content

Reply to "My layout currently has tubular track 031. I’mLooking to expand the curve sections to 042."

The answer here depends on how much space you have.  If you have the space, O72 is the way to go.  Everything looks and runs better on O72.   If you have to compromise, O42 is certainly not bad but - that is what I use on our outer loop - but you will have limitations.  

The other thing to consider is the wisdom of running full scale equipment if space is enough of an issue that you cannot accommodate O72. I debate this internally all the time.  Where I have landed, fwiw, is that unless you have room for a very large layout, sticking to the scaled down equipment is generally better because it simply looks better on those smaller layouts.  So MTH imperial steam or Lionmaster is the way to go generally.

HTH.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×