Skip to main content

Reply to "My layout progress pt 3. Updated 4-28"

Here are some of the latest shots of progress on the bridge. The first shows the last two steel towers on the west end. The N&W is beside the road.

The second is of the sides of the trusses for the main part of the bridge. The plastic side is for looks and the brass part behind is for strength. The pairs of laminations will be joined by laser cut spacers.

The last two show the finished east end with a set of VGN EL2’s-b’s nosing out onto the bridge. I have also installed some facia to finish off the scene.

One more showing the Chief Superintendent of the Railroad. His name is B.

Attachments

Images (5)
  • 39F8E885-3C2A-48A4-8C7F-4C7417E2AABA
  • 46133764-9756-4DAF-A109-5083CA70EB0E
  • 99716A6D-6869-463C-8343-24AFECD70227
  • BA77812B-1998-4D4B-868C-62F62E08D3A9
  • D947A94A-5DBB-4038-A936-A579E1A184C0

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×