Skip to main content

Reply to "My new Menards Track"

If you have only one feed point in a loop, you can pull apart the track joint (all rails) just to the left or right of the feed point.  This makes all the current flow in a well defined path from the feed point to your test point, rather than an ambiguous path that could be either way around the loop.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×