No one really ever shares the underside of their Layout & their Wiring…
I am Proud to say/ show/ n’ share that mine is fairly organized & strapped down. During the time I have taken working under here it has been a priority from day one that it’s keep neat & clean (as is possible for layout wiring). I plan on labeling it all, but that’s a job for another day.
Sunday was a Big Success!
All twelve switch wires have been ran to the Control Panel. The two UCS sections have been wired & ran to the backside of the control/ display cabinet. And as much wire as I had on hand was able to run four of the some odd block powered sections wire to behind the cabinet. All wires are labeled accordingly. Next up is to grab a few more rolls of wire so I can finish up the track/s power. Things are coming along great round here.