Fabricating the 1-3 Smoke Stack w/ parts on hand in my shop. Need to purchase a four way + copper fitting (shown mocked up of my homemade one w/ the blue tape covering the joint).
The Smoke out of All Three Stacks is being driven w/ smoke fluid by an All Original untouched/ as received 2025 Locomotive w/ Aluminum Stack w/ Rubber Stamped “2025” on the Boiler Front Keystone… & OH, MY, Goodness does this thing Chuff like Ten Men in a Cigar Room!!!
What a Fun Project!