While I'm waiting 3D parts to be delivered, I began to make the pipes which run everywhere along the sides of the chassis.
I wondered how to do but I have found a solution to this problem: very thin electric wire (0,5 mm diameter) supported by pieces in U shape (EVERGREEN channel 2,5 x 1 mm) cut in 1 mm width.
I first made a template in a 2D drawing to have the exact space between U pieces; I re-do it to know how many wires I have to lay down!
I will have to draw other templates for other areas of the chassis.
It's time consuming but I think it will be fine.
Now all is drying until tomorrow!
It's extremely inadvisable to do this work with mittens...........
jpv in France