Skip to main content

Reply to "MY SD40-2 IN 3D"

I received these parts:

15_2_2018

The snow plow will be installed when I will get the detail parts for the front face (air hoses, brackets for lift bar, etc..)

Today I fixed the coupler pockets:

18_2_2018a

18_2_2018b

The last two parts are the air tanks; I have to improve them with pipes before gluing on the chassis. It's the work for this afternoon!

jpv in France

Attachments

Images (3)
  • 15_2_2018
  • 18_2_2018a
  • 18_2_2018b

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×