Skip to main content

Reply to "New Build - Builders in Scale - Final Post"

Did some more work on the super structure - gluing the sides together was relatively easy but adding the cross bracing was a bear.

I will be struggling with the hoist assembly - instructions are real fuzzy plus not any good diagrams. I read the instructions twice, stared at the drawings and decided to move on to the hoist house...............

IMG_3471

IMG_3472

The hoist house is shown below. Since it would be real difficult to access the inside for paint I decided to stain the inside first then glue. I will leave the insides alone and paint the outside. The ore skip is put together (sits inside the hoist house). I will leave the door part open so one can see the ore skip machinery inside.

IMG_3473

Since the ore skip assembly is included I am adding a floor to the hoist house. I still need to add bracing to the floor since it warped after applying the stain. A weight on it over night reduced the warp considerably. Right now I am thinking instead of adding bracing inside place it on the bottom so the building looks like it is lifted off the ground. I had to place a weight on the roof also but once glue to the rafters it should be ok.

IMG_3474

IMG_3475

Attachments

Images (5)
  • IMG_3471
  • IMG_3472
  • IMG_3473
  • IMG_3474
  • IMG_3475

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×