Skip to main content

Reply to "New Build - Builders in Scale - Final Post"

The structures are assembled. If one looks closely they can see the wire supports and NBW on the hoist structure. I did a background stain in preparation for painting this time around. I included the finished ore bin as a comparison. You can also see where the glue lines did not accept stain. The rods were easier than I thought they would be. I envisioned having to drill holes on both ends but ended up drilling one hole and since the wood is so soft I merely pushed the metal rod into the opposite end.

IMG_3491

IMG_3492

IMG_3493

IMG_3495

IMG_3496

I will start sponging on browns today.

Attachments

Images (5)
  • IMG_3491
  • IMG_3492
  • IMG_3493
  • IMG_3495
  • IMG_3496

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×