Skip to main content

Reply to "New Generation Legacy Locomotives Fail on Existing Layout"

You mentioned your track is not fixed yet.  Those new engines are also bigger, longer than the diesels you tested with and the track is probably flexing as it goes over it, losing connection for a second.

Even on straight sections the track need to be solid, level, tight connections between track sections.  As a test you could screw done and shim the spots where it drops out and retest and I bet it will go through the sections fine.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×