Along this 20-25 foot area where there were three different LRS dropout locations, the track was already tightly connected and level, and in fact there were some electrical connections close to a couple of the dropout locations.
All I did yesterday was to thoroughly clean the rail top surfaces. before cleaning, visually they did not look that bad, but my white soft cotton cleaning rag was VERY black afterwards.