Skip to main content

Reply to "New Haven R-1 Mountain Build"

Thanks John, Scotty, and Bill.

John - that feedwater heater looks good on the Mikado, and see you added the CN number boards as well. I always liked that look, good job.

Not much in the way of piping was done this last week, but I did receive my first revision of the air pump shields from Shapeways. They really complete the look and separate this from a standard USRA engine.

28 Air Shields Rev1 1

29 Air Shields Rev1 2

30 Air Shields Rev1 3

I only figured out how to mount these shields after I began playing around with revision 1 here - my original intention was to epoxy them in place after painting, but I am always in favor of making parts replaceable if damaged. I realized that with some longer mounting screws (courtesy of McMaster-Carr) and a larger base, the pilot-to-frame mounting point could be used to hold a single piece shield in place. Revision 2 is shown below, with adjusted spacing between the shields and a larger base with mounting holes. I also found out recently that the engineer's side shield, aside from being asymmetrical, was actually slightly taller than the fireman's side, so that has been modified as well.

31 Air Shields Rev 2

I have a few more detail parts on order to begin working on the piping again, as well as a few more miscellaneous items. I haven't yet found an appropriate feedwater heater pump for cab signal box, so I might need to 3D model and print those as well. They are mounted adjacent to each other, so if I need to go that route I'll have it made as a single part.

~Chris

Attachments

Images (4)
  • 28 Air Shields Rev1 1
  • 29 Air Shields Rev1 2
  • 30 Air Shields Rev1 3
  • 31 Air Shields Rev 2

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×