@wb47 posted:Just me, but the plan has an awful lot of switches.
Looks good for an operating layout; several areas for industries. It is missing a dedicated yard lead, but the inside station track can be used for that. The two inside station tracks can also be used as a yard run around track if no passenger trains are parked there. Not ideal, but usable for one-two operators.