Skip to main content

Reply to "new house new layout build - slow slow progress"

OK to many people to reply to, so it going to be one big post.

We now for sure that the floor is. This was my great grand parents house. Some tiles are already popped up and missing. Between my grand father, father and my self we think its the smart move. If we ever go to sell it later we dont need to worry about it then. We will we be sealing the floor after its all removed. Then followed with some carpet squares.

For the ceiling, its not at a standard height. Track lighting my be a little issue. For right now the plan is to go with recessed lighting. I havent really looked into any low profile track lighting.

Backdrops- Once the bench work is in the back drop will be put in place. That way i can match the elevation.

Access points- until the track plan is 100% i wont know.

054 curves- the only spots will be any of the curved switches. So most large engines wont be using them at all.

track plan- currently making some adjustments.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×