Skip to main content

Reply to "new house new layout build - slow slow progress"

Well been toying around with another layout idea. I lose out on a couple of industries compared to the other layout. Will have more  elevation changes, mountains and tunnels. My max grade is 1.7%, all yellow track is a elevation change. No change is more then 3 inches total at once. That way I was able to cut down on the distance needed. This also helps with my plan to model PRR/ New England. Another thing I do gain from this is I added a small inter change on my branch line. This way I get some more operations when running. Mainly being coal mine will be located too left of the main line. Power plant is bottom left on the branch line. With mainly running PRR, B&A and B&M I think this will work well.
Tracks are as follows.

Red - main line                                                      
Blue - yard/ service                                              
Gray - branch line/ inter change                        
Green - 3inch elevation track                              
Yellow - elevation change1F3E82CF-FD6B-49CB-BCA6-1838A86F2773

Attachments

Images (1)
  • 1F3E82CF-FD6B-49CB-BCA6-1838A86F2773

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×