Skip to main content

Reply to "new house new layout build - slow slow progress"

Well busy weekend got a bunch done. We were finally able to get the old furnace out. That was fun, took 3 of us a quad plus a come along. After that pulled up the old floor and skim coated the floor. Next will be removing the bad spots on the walls. Followed by framing one wall for the baseboard heat. Once I get the inspection completed the real fun starts. C2B38B9E-FD69-4C60-AD6B-FA162A6730C4BD469599-4410-488E-A341-A64E48C4AC35A9BF39AF-E40C-4DB7-9CBE-6F50E7033BF8

Attachments

Images (3)
  • C2B38B9E-FD69-4C60-AD6B-FA162A6730C4
  • BD469599-4410-488E-A341-A64E48C4AC35
  • A9BF39AF-E40C-4DB7-9CBE-6F50E7033BF8

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×