Nation Wide Lines posted:I hate to say it, but you should really pull the track up and put at least 1 inch styrofoam insulation down as a base. Your layout is going to be very noisy otherwise, as it looks like you are screwing the track directly into the plywood.
I know I wish I had put styrofoam in between the homasote and plywood on my layout.
I want to overhaul my temporary layout starting in January and do something like this. Do you still secure the track to the foam, and if so how?
I kinda like the felt idea, but I have also had problems with the drill bit grabbing cloth and making a mess.