Skip to main content

Reply to "GeorgeS Layout Build - backdrops - Updated 03/08/2020"

Progress this weekend... I installed the padding on the upper level. Now I need to finish the 5 rail track.

i started laying out the track on the lower level. The Standard Gauge loop is finished. It is mostly new USA Track with a little MTH and some vintage mixed in for the cuts. I have two loops of O gauge to complete, but I am worried about the clearances. 

CDE7A97E-C8CC-4899-8FAA-F6648BCA6FE7

I am also working on how I will finish the transition between the lower and upper levels. I’m thinking of making a wall like this.

3E3DC412-4268-4E7E-B20A-39AE9A306327

George

Attachments

Images (2)
  • CDE7A97E-C8CC-4899-8FAA-F6648BCA6FE7
  • 3E3DC412-4268-4E7E-B20A-39AE9A306327

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×