Skip to main content

Reply to "GeorgeS Layout Build - backdrops - Updated 03/08/2020"

jhz563 posted:
George S posted:

The stone walls and tunnel portals are installed.

CBE25EA7-849E-4353-9EAB-93DB24B3921B4C3A95A4-5210-4032-B255-83BC2FA1BC81945AE79B-6D48-434E-8AB5-BEF32E320FA6102E0A3E-6ADE-4F11-BAEB-0A6189B7D0C1

Next step is lighting.

George

George, I can't tell you enough that this is looking fantastic.  I am envious of your progress and taking serious mental notes of your work.

I really am not a fan of fast track but it looks nice in this application.  The fact that you also have the oft overlooked background work done is a huge plus too.  Ie. walls painted, generally good lighting, skirts applied already.  All these things make your work and your collection look even better.

Bravo sir!

Thank you. I will eventually replace the Fastrack. You can see that I adapted it to tubular for now. I'm not replacing it for its looks, but it is really noisy. I have a decibel meter on my phone. I'll take some measurements for you guys. Unfortunately, it's a budget thing. It's probably a $250 worth of Menards track to buy to replace it, and the utility isn't there right now. 

For the walls, yes, I painted them and am happy with it, even though I didn't do the full drywall finish approach. I do plan to add some sky background and think I just determined the approach to mount it. Look for that to come soon.

George

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×