Skip to main content

Reply to "New Layout 2021-24......Update, April, 15, 2024"

More progress.....I am leaving the main layout level together to run trains. The upper level engine yard is coming down and the lower subway is disconnected. The attic continues to be emptied so that room construction can begin in February.

2FC48A30-765B-4D75-B76A-BE0D639B0E39452699CD-96BE-48BF-9C2F-3B6BD3A1CB8BA02755DB-51A3-482B-968A-FD4F73EAF19434E61BFB-CAC3-46C8-93F8-3483609AF215

Peter

Attachments

Images (4)
  • 2FC48A30-765B-4D75-B76A-BE0D639B0E39
  • 452699CD-96BE-48BF-9C2F-3B6BD3A1CB8B
  • A02755DB-51A3-482B-968A-FD4F73EAF194
  • 34E61BFB-CAC3-46C8-93F8-3483609AF215

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×