Skip to main content

Reply to "New Layout 2021-24......Update, March 3, 2024"

Peter,  That's a really nice space.  Great idea w the HVAC.  Looking fwd to seeing the lift pics.  How's your wiring / power availability to the room. I'm assuming they'll be pulling in new wire for the hvac unit; if you don't have enough existing power available for the layout, you may want to have them pull in some train room dedicated additional power.  In our train room i ran 2 separate 12-2 circuits to power only the wall plugs and put each feed on a 20a heavy duty wall switch, so that when we leave the room we flip the switches and kill all power to the room / layout. A safety thing for young kids and old guys who forget 20200513_091020stuff.     

Attachments

Images (1)
  • 20200513_091020: Red switches are 20a hvy duty. white are dimmable track lighting

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×