Peter, That's a really nice space. Great idea w the HVAC. Looking fwd to seeing the lift pics. How's your wiring / power availability to the room. I'm assuming they'll be pulling in new wire for the hvac unit; if you don't have enough existing power available for the layout, you may want to have them pull in some train room dedicated additional power. In our train room i ran 2 separate 12-2 circuits to power only the wall plugs and put each feed on a 20a heavy duty wall switch, so that when we leave the room we flip the switches and kill all power to the room / layout. A safety thing for young kids and old guys who forget stuff.
|