A few pics from current progress.....the electricians have been here all week......

The flooring is picked out.

After the electricians finish, then comes drywall, then flooring and then painting. I suspect a May 1 finish......

Then the rest of the current layout comes down and dismantled with the Mianne parts going up to the attic.

I am talking to Tim at Mianne this week and I will figure out what I need and figure a delivery in June.

I have made a contact with Steve at Ross and he says a 3-6 week time for orders. I will aim for July.

Later I will post some track plans.......with explanations of what I am doing......and listen to suggestions for changes.

A lot of different angles to give you an idea of the fixed obstacles (doors, ceiling hatch) that I will have to work around.

F3236F21-3807-45BC-A23F-9714E810C4E5EDADA79D-4697-41B0-A88F-FFC7DC9DAF672529CCAF-CBF3-403E-B42F-E3A05C8317D11D3A9D8F-2B19-488D-B509-CFF1763604B6ACA8E060-28EB-4F9F-9021-9152D3D42FB0C18AE299-57B2-4B1B-A404-BA3E5D37ACC5C2AD2217-78C6-463A-AA61-990963C4C7192A9DA067-2CC9-4B13-AEA5-787A08690C6E50980E18-BE61-43FB-8175-DF5A8C2E9DED

I get more excited each day!

Have a great and safe weekend, folks.

Peter

Attachments

Images (9)
  • F3236F21-3807-45BC-A23F-9714E810C4E5
  • EDADA79D-4697-41B0-A88F-FFC7DC9DAF67
  • 2529CCAF-CBF3-403E-B42F-E3A05C8317D1
  • 1D3A9D8F-2B19-488D-B509-CFF1763604B6
  • ACA8E060-28EB-4F9F-9021-9152D3D42FB0
  • C18AE299-57B2-4B1B-A404-BA3E5D37ACC5
  • C2AD2217-78C6-463A-AA61-990963C4C719
  • 2A9DA067-2CC9-4B13-AEA5-787A08690C6E
  • 50980E18-BE61-43FB-8175-DF5A8C2E9DED

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×