Not a lot done this week. We will finish the plywood and hopefully get the lift bridge motorized by the end of next week.

I have bought a gallon of brown paint the cover plywood. I put out some track to see if it agrees with the spot for the transfer table (it does!).

Lastly, I put the switches and special track pieces inside their roadbed.

4AF41ECB-28BD-40E9-9C32-263CF94263F2_1_201_a50E570DB-9576-44AF-B907-0132EC1CEF4461DD754E-F8E9-4730-910B-433F37E2EDB8CD7B260C-D54F-465A-9152-97FD1C6BAF0E

Moving forward..........slowly......but, moving forward!

Peter