With the help of my good modular group friends......things are starting to roll!
1st, I needed another 3 ft I-beam for my transformer shelf. I had these extra cantilever beams which I no longer needed......I adapted two of them to become a new I-beam.
Last Friday, Tom (Gilly@N&W) came over and we finished the plywood decking. The Lift Gate motor was hung (but is not connected-a project for a future session).
This week, I will be sanding the edges; filling the gaps with plastic wood; more sanding; and then, painting the plywood with an earth brown color.
Peter