Skip to main content

Reply to "New Layout 2021-24......Update, April, 15, 2024"

@Former Member posted:

Hi Peter,  really enjoy your updates! You seem to be really close to getting at least one loop of track up and running.  Are you thinking of a target date for that.  I don't think I could wait much longer.

Dave.......no time limit.

I'm spoiled. Just got back from running trains at York. In addition, I have our three modular layouts 6x11 tinplate, 12x15 and 21x43 Atlas O to run on. There is an 11-3 "Halloween Open House" for the public this weekend.

Consequently, I am taking my time. I can stop when I come to an impasse and really think it through. When I'm tired, I can leave in for another day, etc. I can plan for "helpers" when I need them.

Once I get the track down in a generally complete configuration, it will be time to call for helpers. Time to install the Ross 27", 5 stop Transfer Table, make sure the track is straight, assign power and plan the overall wiring.

I am also spoiled that I have skilled helpers who are generous with their time.

In addition, I am currently President of our local modular group. Our busy time is upon us. Starting November 19th, we are committed every weekend (and some weekdays)  for 9 consecutive weeks!

Peter

Peter

Last edited by Putnam Division

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×