@Former Member posted:Hi Peter, really enjoy your updates! You seem to be really close to getting at least one loop of track up and running. Are you thinking of a target date for that. I don't think I could wait much longer.
Dave.......no time limit.
I'm spoiled. Just got back from running trains at York. In addition, I have our three modular layouts 6x11 tinplate, 12x15 and 21x43 Atlas O to run on. There is an 11-3 "Halloween Open House" for the public this weekend.
Consequently, I am taking my time. I can stop when I come to an impasse and really think it through. When I'm tired, I can leave in for another day, etc. I can plan for "helpers" when I need them.
Once I get the track down in a generally complete configuration, it will be time to call for helpers. Time to install the Ross 27", 5 stop Transfer Table, make sure the track is straight, assign power and plan the overall wiring.
I am also spoiled that I have skilled helpers who are generous with their time.
In addition, I am currently President of our local modular group. Our busy time is upon us. Starting November 19th, we are committed every weekend (and some weekdays) for 9 consecutive weeks!
Peter
Peter