Skip to main content

Reply to "New Layout 2021-24......Update, April, 15, 2024"

The track laying is coming along.......

I need to finish the sidings; cut the track for the Mianne Lift Gate (which I will only do with an experienced chaperone). Then it will be the Ross Transfer Table.....followed by wiring. Before ballasting, I will superelevate the curves.

I am very pleased with the design. I have lots of space for structure building, which I really enjoy.

7F6EC41E-10FB-4C1E-988A-BE668AE16D82

The place where I will put the TW TrainWorx New Haven switch tower.....

ACF91972-2D10-4164-A0C3-A73BE3DA9FCF462E4805-7920-4E71-946A-2CF870874C0C

You can see two sidings where I bring the track down to table top height......the Brennan's Oblong Box Company and the TW Tranworx' Rock Island freight house work better with the track lower (off roadbed).

643EFC7E-EFCE-47EF-8565-47078724F49C

The parallel tracks approximate the engine house on the other side of the transfer table.

8EC9E05B-5D5D-4078-9E48-1932AE73BD32A1173A32-7F59-4B82-96F8-A31455F4084E

You can imagine the transfer table's spot from this view.

CD26E819-C130-44B6-9D44-183E6BB859659CEBF340-BC17-4EDA-AC54-F03A269DAB75

I am very happy with my progress!

F3003995-9708-4359-ADD3-D1E5948ECA6B

Have a great day, everyone.

Peter

Attachments

Images (9)
  • 7F6EC41E-10FB-4C1E-988A-BE668AE16D82
  • ACF91972-2D10-4164-A0C3-A73BE3DA9FCF
  • 462E4805-7920-4E71-946A-2CF870874C0C
  • 643EFC7E-EFCE-47EF-8565-47078724F49C
  • 8EC9E05B-5D5D-4078-9E48-1932AE73BD32
  • A1173A32-7F59-4B82-96F8-A31455F4084E
  • CD26E819-C130-44B6-9D44-183E6BB85965
  • 9CEBF340-BC17-4EDA-AC54-F03A269DAB75
  • F3003995-9708-4359-ADD3-D1E5948ECA6B
Last edited by Putnam Division

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×