The track laying is coming along.......
I need to finish the sidings; cut the track for the Mianne Lift Gate (which I will only do with an experienced chaperone). Then it will be the Ross Transfer Table.....followed by wiring. Before ballasting, I will superelevate the curves.
I am very pleased with the design. I have lots of space for structure building, which I really enjoy.
The place where I will put the TW TrainWorx New Haven switch tower.....
You can see two sidings where I bring the track down to table top height......the Brennan's Oblong Box Company and the TW Tranworx' Rock Island freight house work better with the track lower (off roadbed).
The parallel tracks approximate the engine house on the other side of the transfer table.
You can imagine the transfer table's spot from this view.
I am very happy with my progress!
Have a great day, everyone.
Peter