After a month of almost continuous public displays......I asked some of the gang to join me in a work session on the new layout.

My goal was to cut track for the lift gate and plan the next step. This would be a minimal work and a maximal think and plan session.

My thanks to Tom, Ken, PeterM, Dexter and Jerry.

We got a lot done. The lift gate track is cut and we planned the wiring. The Ross Transfer Table is out and we planned for its installation. An improvement to the engine yard lead was discussed and planned.......The  next session will be to motorize the lift gate and actually install the transfer table.

Here are a few pics!

E6851D00-D5C7-4AE4-8546-14CDD6D2700278E6B500-12CF-4F98-944E-A6FE38B6FB2B9D1E772C-81E7-4FB5-B8AE-85214DD06D38275A97F3-1C58-4C00-8B41-387F1918DDA01B5CDD74-1BA7-4369-A750-FBC33B203C7A06290F81-341E-414D-93DA-542F5C55634DED7A0E27-33FF-42B5-A2E1-395569D5AAB789DB8EA0-3972-497D-8FCA-C626AD78CD5D79A97A3E-8421-4211-992E-2FB595814328D7E66989-581C-4475-BCDB-6F3F0863F848

Merry Christmas and Happy Holidays, folks!

Peter

Attachments

Images (10)
  • E6851D00-D5C7-4AE4-8546-14CDD6D27002
  • 78E6B500-12CF-4F98-944E-A6FE38B6FB2B
  • 9D1E772C-81E7-4FB5-B8AE-85214DD06D38
  • 275A97F3-1C58-4C00-8B41-387F1918DDA0
  • 1B5CDD74-1BA7-4369-A750-FBC33B203C7A
  • 06290F81-341E-414D-93DA-542F5C55634D
  • ED7A0E27-33FF-42B5-A2E1-395569D5AAB7
  • 89DB8EA0-3972-497D-8FCA-C626AD78CD5D
  • 79A97A3E-8421-4211-992E-2FB595814328
  • D7E66989-581C-4475-BCDB-6F3F0863F848
Videos (1)
075CC42C-729B-4AD2-8A92-7D668E9BDFD0
Last edited by Putnam Division

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×