Once I wired this up, things moved along......a busy week since I got back from New York....
1st, I had to get access to the Transfer Table from the freight by pass......I had to lover the RossBed to table top level.
This is a five track Transfer Table......unfortunately, this Engine House is so wide, that I can only fit in 3 tracks.....I had to juggle my design a bit.
Having the control panel under the building roof is very handy.....
I finished the Engine House over the weekend. These are the boards which went between the tracks in the Engine House.....
Outside for some weathering......
"Between the tracks" flooring in.....
.....and, we are ready to move on!
Buying wire this week.....WOW....copper has gotten expensive!!!
Peter