Skip to main content

Reply to "New Layout Build- Final tie coloring added (Pics added 4-15-17)"

Worked on some of the storage space underneath the layout today as well as some more back drop work.

Patching some of the holes.  I'm not too worried about the final appearance as 1/3 to 1/2 of it will get covered during the scenery process and the rest with backdrops from backdrop warehouse.

20170225_161518[239]

Final section of masonite at this end was installed....

20170225_161533[240]

Painted....

20170225_172827[241]20170225_172833[235]

Lower storage shelf framing installed...the Mrs. has a few things Aaaa Hemm to put in here...

20170225_193813[236]20170225_193818[237]

13 years old and he's tired......

20170225_193838[238]

Attachments

Images (7)
  • 20170225_161518[239]
  • 20170225_161533[240]
  • 20170225_172827[241]
  • 20170225_172833[235]
  • 20170225_193813[236]
  • 20170225_193818[237]
  • 20170225_193838[238]

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×