Skip to main content

Reply to "New Layout Build- Final tie coloring added (Pics added 4-15-17)"

WOW!!! Your layout benchwork is AMAZING!!!

My total layout area is 25'x50',with 2'7" shelves in width on the north 44' run that will house my yard & a few industries. The shelf is 37&1/2" high from the floor. The east end has 2'5" wide shelves,same approximate height. I have about a 10' run of shelves 3' wide on the south end then it's water works,i.e. sump pump,water heater,etc.,then I have about another 16' run of shelves 3' wide finishing up the south wall. The shelves on the west end are 3' deep but I can only run about another 10' on that end as desks & furniture take up the rest of that run. So I plan about a 44' run on the north end of the basement,then make a 50' radius curve heading south. I plan to use the south shelf mentioned last for a short industry. The south shelfs will house something. I plan on making a straight run east & west that'll house mainline tracks. My basement's full,but I'll work "over" the obstacles as lumber becomes available.

My "thing" here in my area,is that it looks "cramped" compared to yours,Chris,and I thought you had a shorter area,correct me if I'm wrong. What am I missing? I'm trying to view my layout from my mind's eye while you have a table top laid out. 10 60' grain hoppers fill up a yard track & it makes me think O is going to look "out of place" in  my area. Am I just being paranoid?

Al Hummel

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×