Skip to main content

Reply to "New Layout Design"

As mentioned above I managed to assemble one 5-panel side and the 2-panel front and back.

2021-08-09 Diesel shed 001

There are mold pin indents on the back of the peaked and flat tops that will show after the roof is installed. I filled these in with putty and will sand them later on. The seam where each wall meets will be covered by an H-column. I plan on laminating concrete sheets to styrene to cover the area at the bottom of each panel where the mold pins are.

2021-08-08 Diesel shed 001

2021-08-08 Diesel shed 002

Attachments

Images (3)
  • 2021-08-09 Diesel shed 001
  • 2021-08-08 Diesel shed 001
  • 2021-08-08 Diesel shed 002

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×