Skip to main content

Reply to "New Layout Design"

Started pulling off what track I had screwed down and powered. Once I get the table cleaned off which also means clearing out all the track wiring from the bottom of the layout table my plan is to go slow with re-routing track power terminal boards making sure all the runs from the power supplies to the boards and board to board are heavy gauge wire. I believe some of the runs were 18 gauge. I want to make sure I have 14-16 gauge minimum. I am using Split Jaw connectors for track connection so the wires from the terminal strips to the track will be all 18 gauge.
Then it is on to the top. In my haste to lay track (other than painting the homasote white) I did nothing else except lay some Woodland Scenics sand mats down for the yard. I kind of like these mats. My plan was to paint after the track was installed and tested out. Since my layout is small I think instead I may go back to the grass mats. I used these  on my last layout. I had a little problem with the mats laying down with wrinkles or bumps but all in all they looked good and because of their vinyl backing provided a great moisture barrier base for further scenery work.

New Layout 001

Attachments

Images (1)
  • New Layout 001

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×