Skip to main content

Reply to "New Layout Design"

A VIEW FROM THE UNDERGROUND (pun intended)

I spent Sunday under the layout routing power wires for track, ITADS, Acc, and turnouts. Below are some photos. I actually cleaned up a lot of 'hanging wires' bit it's a jungle under there.

Wiring 001

This is the back of the power supply drawer. I have two 180 watt power bricks plus the MTH Z4000 to power the three track power districts. The 14 volt AC output will power all ITADS. I have a 30 watt 12DC power supply (3 taps at 10watts each) to power all accessories and a small Lionel 1 amp Acc supply for my turnouts.
It is hard to see however other than power cords I have all output wires from the supplies connected to European style terminal boards on the bench-work with enough slack to allow me to pull the drawer out. A close up is shown below.

Wiring 003

Next to this drawer is another pull out drawer that is my 'control board'. It contains toggle switches for the turnouts, Accessories and track spurs. The connection scenario is the same as with the power supply drawer.

Wiring 002

There is a lot of clutter under here and it is only going to get worse when all spur tracks, turnouts and accessories are connected. Note - all the red 'connectors' hanging off the European terminals are wire ferrules.

https://www.youtube.com/watch?v=os66cID30Ek

I also tweaked my design by adding a long track lead to the industrial siding. The thinking here is that a diesel can drop off its delivery of empty cars and pick up  loaded cars from each siding. I just need to determine if I still have enough room for the buildings I want to fit.

CLONE of timesaver 2d rev 4

Attachments

Images (5)
  • Wiring 001
  • Wiring 003
  • Wiring 002
  • CLONE of timesaver 2d rev 4
  • CLONE of timesaver 2d rev 4

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×