Skip to main content

Reply to "New Layout Design"

Did some work on the yard this Sunday. As mentioned in the last post I had to move one yard cross over up further to allow enough room for a locomotive to back up into the next yard lead. It took some maneuvering of track and some more custom cutting track to length. I cut roadbed to fit then added power lines to all track (that's the mess you see in the second photo) and will connect to terminals next weekend. Then hopefully it is on to connecting the cross overs and non-derail features for the 4-way. After that connecting the decoupling tracks.

I also have been making sign posts (got this from a job I did for a customer) that designate the turnout number to coordinate with my control board. I think it is much better to say 'park the box cars on siding #5' rather than 'the fourth siding from the right'.

Prescott Layout 001

 

Prescott Layout 002

Attachments

Images (2)
  • Prescott Layout 001
  • Prescott Layout 002

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×