Ok, see if this works for you...cut out sub-roadbed on pylons as an elevated line to park the long train. The loop past the switch is 160". The grade to the switch is 5%. The elevated loop is in Layer 1 to view it in the 2D track plan. Avoids going under and dealing with the quick drop and framing.