Skip to main content

Reply to "Finally Starting - New Layout, Wiring Diagram, Control Panel"

Ok, see if this works for you...cut out sub-roadbed on pylons as an elevated line to park the long train. The loop past the switch is 160". The grade to the switch is 5%. The elevated loop is in Layer 1 to view it in the 2D track plan. Avoids going under and dealing with the quick drop and framing.

 

Attachments

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×