Skip to main content

Reply to "Finally Starting - New Layout, Wiring Diagram, Control Panel"

Update 3/5/17

I've had the track laid over homasote and on the benchwork for a couple weeks now, but had to take a week or so off for a vacation out of the country.  I have all of my power drops run using 16ga wire, but not soldered yet.  I'm currently working on wiring the turnouts and operational tracks (which I need some help with, please see my thread asking the question about this) using 20ga wire.  Here is what it looks like so far.

20170303_204413FB_IMG_1488601889889

Oh, and of course my helper is right by my side as always.

Attach10167_20170303_190924

Attachments

Images (3)
  • 20170303_204413
  • FB_IMG_1488601889889
  • Attach10167_20170303_190924

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×