Skip to main content

Reply to "6/25/22 Rockpoint RR Update"

I updated the Scarm file to include a roundhouse and connected the yard lead back to the turntable lead. I also brought the main elevation up 3/4" to better accommodate tall rolling stock going under it. Max grade is 5% but its only for a few track lengths. I am kind of struggling with where the tunnels will start and stop as the support structure for the plateau over the lower reversing loop is going to be interesting.snapshot 3

Attachments

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×