Skip to main content

Reply to "6/25/22 Rockpoint RR Update"

@Mallard4468 posted:

Depending on the length of trains that you want to run, the double-ended yard can be somewhat limiting.  Might want to consider some long staging sidings, either along the long side (if there's space in your room) or as a narrow extension reaching into the empty space to the left.  The multi-track staging can be as little as a foot wide, so it doesn't require a lot of lumber, and it's really convenient for taking trains on and off the layout.

For right now I am going to leave that real estate to the left alone. The door to the basement swings in there (will be re-hinged to swing out) and also my current track bill is higher than the GDP of most third world countries. I will probably be expanding and kicking myself later.... but I think it will be easy to expand leftward when the time comes as none if the tricky track work is over there.

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×