Skip to main content

Reply to "6/25/22 Rockpoint RR Update"

I laid out the benchwork and the main loops of track to get an idea of spacing. Ran some big steam today and the trains really looked good on the long back straight. Here are some update pics.IMG_6824IMG_6825IMG_6827IMG_6828IMG_6830

Attachments

Images (5)
  • IMG_6824
  • IMG_6825
  • IMG_6827
  • IMG_6828
  • IMG_6830

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×