Skip to main content

Reply to "CPR Mountain Division “Kicking Yahk Pass”(April 29 2020)"

 I've been busy on my layout, de-cluttering, organizing things I haven't had the time to do til now.

 I have wanted to have a place for the small coal mine spur on the top level and have decided to move it the the opposite side of the layout...lol. This will require partially covering the top of the 2 track siding on the main level. This will allow me add more bang for my buck.

 I have cut 2" strips of foamboard at 5 1/2 and 7 1/2" widths , build the upper mine addition.

 Here are some pics showing the progress

AlIMG_20160625_202430IMG_20160625_202412IMG_20160625_184148_editIMG_20160625_184256_editIMG_20160625_184218IMG_20160625_165753

Attachments

Images (6)
  • IMG_20160625_202430
  • IMG_20160625_202412
  • IMG_20160625_184148_edit
  • IMG_20160625_184256_edit
  • IMG_20160625_184218
  • IMG_20160625_165753

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×