Skip to main content

Reply to "New Layout-Pt 1 (Initial Planning)"

The ATTACHED drawing gives you an idea of the various support structures for the planned layout.  I drew these to 3/4" scale on small size drawing paper (graph).

EACH rectangular symbol is constructed of 2 x 6 kiln dried whitewood studs with 1/2" thick plywood tops.  There are also 2 x 6 re-enforcing cross-members along the length of each structure as required.  I didn't want the plywood to sag.

In the drawing, the symbol shown on the mid-upper left of page sits on a table with a max support limit of 850 pounds.  YES--  850 ...  the other large symbols sit on tables with a max support limit of 2000 pounds !!   Again, YES--I said 2000 pounds !!!!  Each table has a warranty span of TEN years ...  (Hey--have to be careful.. Some of these MTH/Rail-King guys are darn HEAVY !!)  The small, skinny rectangular symbol in upper top right of drawing will be a platform of about 15 x 35 inches running to a bracket on the wall of the living room, already placed by my contractors.

 

During initial placement of all of this heavy lumber, certain pre-wiring was done, wherein one pair of 12-gauge wires,  one pair of 14-gauge wires and one length of 25-pair cable were run to each table unit as indicated by the symbols.  12 and 14-gauge pairs are stranded copper.  10 amp re-settable circuit breakers will be installed as required.  Also TVS diodes everywhere, as required.  Bought plenty from Mouser.

Primary power provided by a re-built ZW-R,  a re-built ZW, and a re-built KW transformer.  A separate 12 vAC and 24 vAC transformer used for misc requirements.

And, a separate 30 AMP, 12 vDC regulated power supply for still "other" functions, as required !!  My power meter will probably be spinning .  (grin)     More to come ...

 

KRK

Layout_Module

Attachments

Images (1)
  • Layout_Module

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×