Skip to main content

Reply to "New layout progress (Some scenery)"

I changed my plans a bit for this end of the layout. I decided to build out a 42" wide platform to host some street scenes and three spurs for industries. You can see the switches are stubbed out. I took a break tonight and did some cleanup and tried to do a little brainstorming on how this part of the layout will look. This section (to be called Northbrook) will be the first to get scenicked. Next up is some basic power wiring and maybe I will try to get a train to run across this thing. Then it will be on to installing the switch machines...

 

 

IMG_1071

IMG_1072

IMG_1073

Attachments

Images (3)
  • IMG_1071
  • IMG_1072
  • IMG_1073

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×