Skip to main content

Reply to "New Layout vs. Old (Build Thread)"

Clem, Thanks!

What kind of interlock do you have on the swing-out? I may be getting too deep in the weeds trying to come up with a relay design that includes a timing circuit to add a delay before the trains are energized after the gate is "down and locked".

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×