Based on Clem's feedback I revised the hinge post...again. This time I ran the supports across the entire face of the legs. I then ran a diagonal from the back. Between these two changes, the hinge post is quite rigid and I think it will work okay. It's also nicely in line with the corner of the outer OSB end point. I wanted the hinge point to start exactly there since I know everything clears the lally column. The spacers under the horizontal braces are there to pack it out to the same point as the ends of the OSB.

 

 swing gate 4.

 

Here's the diagonal brace. As before, I like to fasten these kinds of assemblies to cross-grain wood, not end grain so I added the block under the brace to capture the screws properly. If this brace isn't sufficient, I can add another one deeper down the leg. It will join at a funny angle on both ends so I would fasten it with Simpson Strong-tie straps bent to conform to the various angles.

 

 swing gate 5

 

With the hinge post in place I was able to get back to building the upper framework. The piece I cut yesterday on the left side was too short so I to cut another one. Of course I had to make the 22.5ยบ miter again. And of course if there a least four ways to cut the miter either in the wrong direction or the wrong end, I made three of them. I was still using left-over L-girder from the older layouts and didn't want to use new stock which I'm saving for building the structure under all the bridges.

 

 swing gate 6

 

I going to finish the framework, position and clamp it in position and then build downwards towards the wheel assemblies. Won't be able to work tomorrow or Tuesday, but may get some work in on Wednesday. My consulting "semi-retirement" just got busier with the addition of another project. I'm finishing up one and starting another. It helps the cash flow, big time, but more "real" work time means less train building time.

 

I tried adjusting the 1/2" difference between the two sections of the layout, but was unable to shorten the leveling screws on the high end very much since they were already near the end of the inner travel. I should have paid attention to their position when I was initialing putting the legs into position, but it was a detail that I missed. I did raise the low end a bit by lengthening their screws, but didn't want to add too much to that side since it would "unlevel" this part of the layout. It's not going to affect the grade portion since it's already unlevel. The ground level portion will require some adjustment. 

 

 