Skip to main content

Reply to "New Layout vs. Old (Build Thread)"

If I'm going to sell it, I really should give it back to the company that gave it to me.

 

Today, my oldest grandson and I did some more work on the bridge area. We got the joists in place with him doing the real low work, while I did the cutting. I then built 7 more riser/cleat assemblies, and started getting the subroadbed in place. I had to make some adjustment cuts to the mating edges to bring the roadbed into alignment across the bridge area.

 

bridge end 05

 

The left side of the assembly was a little springy since the rear girder was pretty far away from the wall bracket. My grandson suggested just putting a support under the bottom. It was a simple solution that made the unit very solid. As the subroadbed is added the construction gets more stable. It doesn't get in the way since this part is way to low to ever have to get under... unless you're really, really small.

 

bridge end 07

 

For the temporary bridge I cut and fit a piece of OSB into the gap. I then installed an edge-mounted 1 X 3 on the bottom to act as a stiffener since the span will be more than 31 inches. It makes a nice flat piece.

 

bridge end 06

 

I set the risers for the outer track first. This installation is complicated in that it's part of the down slope of the high line. I temporarily fixed the risers with clamps until the total grade was smooth without any abrupt changes in elevation. I then put in one screw in each riser and went back and leveled the heads before putting in the other screw. That's where we ended today. Tomorrow, I'll finish up the bridge area and with that the bench work will be finished... or at least finished enough to start laying track.

 

The temporary gap filler is just that... temporary. As so as I build the bridges and start landscaping the gorge, the temps will be discarded and the real bridge will take over. There won't be any rush since the trains will be running, but I can't get too complacent since I've already bought them.

 

 

 

Attachments

Images (3)
  • bridge end 07
  • bridge end 05
  • bridge end 06

OGR Publishing, Inc., 1310 Eastside Centre Ct, Suite 6, Mountain Home, AR 72653
800-980-OGRR (6477)
www.ogaugerr.com

×
×
×
×
×