Did some more work today on the middle bridge area. I got all the pieces cut and assembled the right hand frames. I decided to continue the vertical supports all the way to the floor since the nature of the these jogged frames seem to be springy. I had the stock so I decided to consume it. I was able to salvage a couple more chunks of old L-girder, so I only had to fabricate two new girders for the middle spans on the right and left frames. I even scavenged the last of my square stock. One leg is an American 2 x 2, another is a German 50mm X 50mm, and two more are old 2 x 3s from the very oldest iteration of this layout when I was building an N-gauge pike before my son went to college in 1989. I had some metric carriage bolts left, but they were too short to properly pass through all this wood and have enough threads on the outside for the nut and washer, so I used a Forstener bit to counterbore the bolt holes. On the Metric-sized lumber I had to counterbore both pieces, since the Metric is quite a bit thicker than it's American counterpart. Next session I'll finish these up and the benchwork is complete!

 

Middle Bridge 5

 

I still have to fasten this structure onto the existing girders. I'm going to use Simpson Plates again for this. There's really not much stress on this part of the layout since it's main purpose is to support scenery, but I am concerned to maintain the precise alignment between the two parts of the layout. These two bridge areas are the only things keeping the entire front part of the layout from pulling away from the back... plate tectonics and all that...

 

On a totally different subject, I decided to get some nice Keil-Line bridge shoes for the bridges that are eventually going to close these gaps over "dead man's ravine". Valley Model Trains had them in stock and I got three pairs. I actually will need five since the middle bridge is going to consist of three deck bridges to accommodate the curve and each will need shoes on one end.

 

From the ads in the magazines, I thought these were plastic, but was happily surprised to find that they're cast metal. The bridges have to support a lot of weight, such as large 3rd rail steamers. Being metal I'm no longer worried about this.

 

Bridge Shoes in pack